| Sign In | Join Free | My chinalane.org |
|
Brand Name : SOOME
Model Number : SMBD-BNC
Certification : CE
Place of Origin : Made In China Hebei
MOQ : 1Set
Price : Contact
Payment Terms : L/C, T/T
Supply Ability : 20 Pcs/month
Delivery Time : 45 Days /30 Days
Packaging Details : Wooden case or plastic film;LCL or 20' Container
Speed : 150,200,250m/min
Blade&scorer : 5&8,6&10,7&12
Order change : 1-3s(servo type) 3-8s(invert type)
Precision : ±0.5mm
Min.slitting : 135mm
Min.scorer : 0mm
Correction range : 200mm
Width : 1800mm,2200mm,2500mm
Power : 25kw,30kw,35kw
1 . Summarize
Product overview:As an important equipment of corrugated cadres,complete the high quality line of cardboard and precise cutting and the size is very precise.Adopt computer-controlled,automatic change order,and reduce waste,improve work efficiency.
2 . Features
1) High quality touch screen and PLC equipped composing the CNC system,connect to the production line.
2) High quality beeline rail and high-precision screw conveying guarantees the precision.
3) A memory of orders,realize non-stop automatic or manual change.
4) Speed synchronizes with board speed.Standard communication interface,easy to link with management system.
5) Alloyed steel thin-blades,sharp and long life of over 8 million meters,auto sharpening.
6) The knife for computer control automatic or manual knife sharpening,edge trimming knife,improve production efficiency.
7) Three types of scorers:convex to concave(three lines).convex to concave(five lines),convex to flat.
8) Two rows of scorers,realizes minimum scorer spacing is 0mm.
9) Computer control score-depth,high quality scorer,more steady.
10) Using the synchronous belt transmission ,low noise,prolong using time.
11) Standard motorized body left-right rectification system 200mm.
3. Technical index
| width | 1800mm | 2200mm | 2500mm |
| speed | 150,200,250m/min | ||
| Blade&scorer | 5&8,6&10,7&12 | ||
| Order change | 1-3s(servo type) 3-8s(invert type) | ||
| precision | ±0.5mm | ||
| Min.slitting | 135mm | ||
| Min.scorer | 0mm | ||
| Correction range | 200mm | ||
| power | 25kw | 30kw | 35kw |
| machine size | 3900*1800*2450 (mm) | 4300*1800*2450(mm) | 4500*1800*2450(mm) |

|
|
Computer Controlled Thin Blade Slitter Scorer Automatic Change Order Precise Cutting Nc Images |